Canaston Bridge WTW Settlement Lagoon

Posted on: 1st Aug 2013 by: WLS: Water-Lines Solutions Ltd

Project Objectives

The existing Lagoon Liner was in a bad state of repair and a solution was necessary to make the Lagoon impermeable again, in order that it could hold pre treated water, a fast turn around was essential.

Project Description

The Lagoon required the existing liner to be removed, the substrate repaired with clay. The new sodium Bentonite system was laid onto the 300mm clay liner, followed by a 2mm thick FPA DWI approved geomembrane.

Products Involved

Bentoline SS100 (GCL), 2mm thick FPA

Outcome

The client required a 2 week period to complete the project, which also included integrity testing. We completed in 8 working days. Total quantity of each product used was 10,000 m2.

Benefits

New impermeable system which should provide a 25 year expectancy.

August 2013

Think we can help?

Simply leave your details below and one our our team will contact you.


#BaffleCurtain installation by Water-Lines Solutions. Check out our website http://www.water-lines.co.uk for more inform… https://twitter.com/i/web/status/1070990841387327488

6 days ago

Another successful #bafflecurtain installation. https://t.co/wPpIG1hCNz

3 months ago

#bafflecurtain installation by our technicians, looking good guys, well done!! https://t.co/3sGn3pYF2B

5 months ago

The sun is shining and our technicians are busy installing #totalgasbarrier in Nottingham. If you would like to enq… https://twitter.com/i/web/status/996032976914960384

6 months ago