Storage Lagoon
Posted on: 1st Jul 2012 by: WLS: Water-Lines Solutions Ltd
Project Objectives
To prevent Algae growth to storage lagoon
Project description
4m x 2.4m floating modules were prefabricated off site. Once delivered, the modules were lowered into the lagoon and joined together with flexibke toggles. The float structure was secured tothe perimeter edge with straining wire and safety net.
Producted Involved
DWI approved FPA 1.2mm,close ell polythene sheets and safety nets.
Outcome
The flexible floating cover provided an immediate effect preventing Algae growth. The client no longer needed to empty the lagoons and clean/remover Algae on a monthly basis.
Benefits
The installation was fitted while the lagoon was active. The system can conform to the dimensions of the lagoon when its full and when empty.
July 2012
Search
Think we can help?
Simply leave your details below and one our our team will contact you.